Startup of FST funderingstechniek

Startup of FST funderingstechniek drilling Olivier piles with their new Liebherr LRB18 machine. The weather unexpectedly caused extreme conditions, but Olivier gave the necessary training for assembling and drilling.

On the first job-site the LRB18 is equipped with three drilling pipes d273mm with the corresponding couplings. Underneath is an auger head for the drilling of Olivier piles d36/56. Everything works in an open concrete system so that reinforcement can be placed in the pile through the rotary head and the drill pipes. The use of the flaps system makes the positioning much more precise. The flaps system also provides more pleasant conditions for the workman, there is no need to lie on the ground to place a lost bit.