Olivier drilling tools shipped up to Boston

Concrete being poured for an Olivier pile at a Sea & Shore construction site in Boston. Fundex F2200 drilling rig in operation.

Sea & Shore completed a job with 150 Olivier full displacement piles in Cambridge Massachusetts with it. Piles were drilled at a depth ranging from 14m up to 20m with a Fundex F2200. The piles will take a load of 75T to support a multi story condominium complex. Olivier provided the necessary on-site training and support.